What this report found

South African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while the better sections target 1.4 to 1.6 Mt a year. Australian longwalls deliver 5 to 7 Mt a year from one face, compared with 3 to 5 Mt at the two local wall operations.

R1500,00

Description

Related Products

Upgrading of coal fines with a Centrifugal Concentrator

Tshepang Mashike

Bench and pilot testing of four centrifugal concentrator models on fine coal from two collieries, with operating variables that resisted correlation flagged for further work. For plant metallurgists.

What this report foundFour centrifugal concentrators all cut ash in fine coal, with desliming the decisive step.

R1500,00

R1500,00

Tshepang Mashike

What this report found

Four centrifugal concentrators all cut ash in fine coal, with desliming the decisive step. The best unit took ash from 35.2% to 18.47% and sulphur from 0.68% to 0.36% in a single stage, raising calorific value from 23.78 to 26.16 MJ/kg. Pilot work reached 19% ash on thickener underflow and reconstituted spiral feed.

Update of Coal Pillar Data Base, Strength Formula and Probability of Failure for South African Coal Mining

2012

Reviews how the failed and intact pillar record, tributary area loading and the safety factor concept have developed since 1960, for rock engineers and regulators.

What this report foundFailures continued after the safety factor approach was adopted, in pillars created both before and after it, so the record of failed workings has kept growing...

R1500,00

R1500,00

What this report found

Failures continued after the safety factor approach was adopted, in pillars created both before and after it, so the record of failed workings has kept growing since the original 27 cases. The database was updated and re-analysed to revise the strength formula and to set out the probability of failure associated with pillar designs.

Relationship Between Remuneration, Employee Morale, Stress and the Subsequent Impact on Safety, Productivity and Profitability.

2006

Study of pay and bonus structures on South African coal mines across management, staff and operator grades, for human resources practitioners and mine managers reviewing incentive schemes.

What this report foundBuilds on an earlier productivity audit that identified fluctuating bonuses and incentives as an influence on output, safety and employee stress.

R1500,00

R1500,00

What this report found

Builds on an earlier productivity audit that identified fluctuating bonuses and incentives as an influence on output, safety and employee stress. The work examines how salaries, production bonuses and safety bonuses are graded and distributed across employee categories, how workers perceive that distribution, and whether incentives in practice motivate production and safe working. Stress and morale are treated as measures of wellbeing.