Characterization of Spontaneous Combustion Emissions

Aircraft and ground monitoring at a working colliery in summer and winter, measuring trace gases and particulates from spontaneous combustion, for air quality management and mine planning.

by Dr Luanne Otter, Dr Stuart Piketh, Ms Thabile Dlamini and Mr Roelof Burger | February 2005

What this report found

Aircraft and ground based measurements at Kleinkopje Colliery showed spontaneous combustion to be a significant source of fine particles, with PM2.5 concentrations 91 per cent higher inside a combustion plume than outside it. Sulphur dioxide, nitrogen dioxide and carbon dioxide were also raised in plume, and benzene and toluene were detected. Average particle size was below one micron.

R1500,00

Description

Related Products

Treatment of Sulphate Rich Effluents with the Combined Electrolytic/Biological Process

2003

Laboratory work on producing hydrogen by electrolysis as the energy source for sulphate reducing bacteria, aimed at cutting the running cost of treating sulphate rich mine water.

What this report foundHydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought.

R1500,00

R1500,00

What this report found

Hydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought. Stainless steel electrodes in acid mine drainage gave hydrogen at about a third of the bought in price while oxidising ferrous iron to ferric, which helps downstream treatment. Iron and zinc electrodes dissolved too quickly to be viable.

GJ de Korte

A manual for authorisation of pitlakes as a closure option for South African coal mines

2021

A practical guide for coal mines and their consultants, built on earlier water research on pitlake viability, with South African examples from the Highveld, Waterberg and KwaZulu-Natal coal fields.

What this report foundSets out the authorisation route for leaving a pitlake as a closure landform, covering water use licensing, environmental authorisation and the wider...

R1500,00

R1500,00

What this report found

Sets out the authorisation route for leaving a pitlake as a closure landform, covering water use licensing, environmental authorisation and the wider legislative process. There is no single application that grants approval, and the route is long and partly duplicated, so several applications are required.

Shopping Basket