Review of earlier geophysical work plus literature, setting out method selection and test site requirements ahead of field trials, for engineers assessing undermined ground before development.
by M van Schoor | February 2008
Microgravity, resistivity based methods including self potential, and time domain electromagnetics are identified as able to detect and delineate shallow old workings, with controlled source audio magnetotellurics useful below about 30 metres. How well each performs depends on target depth, the material filling the void and the overburden, and has never been quantified. Field trials were planned to close that gap.
R1500,00
Description
Related Products
Wetland rehabilitation with Dongalock shutters
2021
Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.
What this report foundCompared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install...
R1500,00
Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.
Review of Current and Expected Underground Coal Mining Methods and an Evaluation of the Best Practices Associated with These
2010
Review of underground coal production systems in South Africa set against practice in Australia, China and the United States, with guidance on equipment choice and section planning.
What this report foundSouth African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while...
R1500,00
South African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while the better sections target 1.4 to 1.6 Mt a year. Australian longwalls deliver 5 to 7 Mt a year from one face, compared with 3 to 5 Mt at the two local wall operations.