Coaltech Research Association

Wetland rehabilitation with Dongalock shutters

Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.

Coaltech | January 2021

What this report found

Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.

R1500,00

Description

Related Products

R1500,00

Dr Andre van Niekerk

Can old bord-and-pillar workings be mapped from surface?

M van Schoor

2016

Desktop review updating two earlier assessments, weighing borehole scanning, robots and unmanned aerial platforms as routes to locating old workings ahead of opencast drilling and blasting.

What this report foundNo surface geophysical method can map individual bords and pillars at the depths typical of the Witbank coalfield, a limit the review attributed to physics...

R1500,00

R1500,00

M van Schoor

What this report found

No surface geophysical method can map individual bords and pillars at the depths typical of the Witbank coalfield, a limit the review attributed to physics rather than to technology, since the targets are small relative to their depth and conductive layers often lie above the seam. Borehole laser scanning remains the workable option, with sonar suited to flooded workings.

Shopping Basket