Coal Mine Acid Mine Drainage Treatment and Sludge Processing
2010
Laboratory evaluation of acid drainage treatment paired with thermal recovery of reagents from the resulting sludge, with capital and operating cost estimates for mine water planners.
What this report foundA modified alkaline barium calcium process was tested on coal mine acid drainage, using calcium hydroxide neutralisation, hydrogen sulphide metal removal and...
R1500,00
A modified alkaline barium calcium process was tested on coal mine acid drainage, using calcium hydroxide neutralisation, hydrogen sulphide metal removal and barium carbonate sulphate removal. Gypsum formation during water treatment fell by 80 per cent, cutting the sludge sent to costly downstream processing to a fifth. Temperature, reaction time, reagent ratios and feed particle size affected thermal treatment of the sludge.
Underground Trials of Seismic-counter and Goafing Characteristics in Pillar Extraction
2003
Underground trials at South African collieries of a seismic early warning instrument first developed for an Australian longwall, with analysis of how roof layers fail during pillar extraction.
What this report foundA stand-alone device was built that detects micro-seismicity within 100 m of the roof and raises an alarm when preset thresholds are exceeded, giving early...
R1500,00
A stand-alone device was built that detects micro-seismicity within 100 m of the roof and raises an alarm when preset thresholds are exceeded, giving early warning of goafing. Input parameters proved not to vary with geotechnical setting. Man-made noise triggering false alarms remained the main obstacle, addressed by signal conditioning and sensor placement.
Simulation of Regional Collapses in Bord & Pillar Workings
2018
Three dimensional modelling of a documented subsidence event in the Witbank coalfield, aimed at reserves in the seam above old workings that current pillar strength formulae sterilise.
What this report foundFinite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar...
R1500,00
Finite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar deterioration triggers snap through of a strong sandstone plate in the overburden. Too little was known about the chosen collapse to back out a real pillar safety factor, so the calibration goal was not met.