Development of Design Procedures for Long Slender Pillars

Design guidance for rib pillars, built from back analysed in situ coal tests and two dimensional modelling rather than empirical data, for rock engineers laying out high extraction panels.

by DP Roberts, JA Ryder & JN van der Merwe | March 2005

What this report found

Numerical modelling produced upper and lower bound strength formulae for rib pillars, the lower bound covering weak roof and floor contacts. The formulae apply between width to height ratios of 0.5 and 2.5, with linear interpolation below that, and give conservative designs above 3. Adjustments were suggested where regular joint sets occur.

R1500,00

Description

Related Products

Application of EARTH Ion Exchange Technology to Process RO (Hipro) Brine from eWRP

EARTH

2010

Pilot trial on brine from a working water reclamation plant on the Mpumalanga coalfield, the first of four studies testing ion exchange on coal mine liquors.

What this report foundIon exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives...

R1500,00

R1500,00

EARTH

What this report found

Ion exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives feedstock, and recovered close to half of the water the reverse osmosis stage leaves behind. On this basis the existing brine pond and the two planned for the plant expansion would not be needed.

J Maaren

Review of Current and Expected Underground Coal Mining Methods and an Evaluation of the Best Practices Associated with These

André William Dougall

2010

Review of underground coal production systems in South Africa set against practice in Australia, China and the United States, with guidance on equipment choice and section planning.

What this report foundSouth African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while...

R1500,00

R1500,00

André William Dougall

What this report found

South African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while the better sections target 1.4 to 1.6 Mt a year. Australian longwalls deliver 5 to 7 Mt a year from one face, compared with 3 to 5 Mt at the two local wall operations.

Shopping Basket