Coaltech Research Association

Best Practice Guidelines for Prevention and Control of Spontaneous Combustion

by Huw Phillips, Sezar Uludag & Kelello Chabedi | February 2011

R1500,00

Description

Related Products

Project 8.3.3 – Framework to Guide Mine-related Land Use Planning Towards Optimisation of the Coal Mining Rehabilitated Landscape

Raina Hattingh

2018

Masters research combining a review of rehabilitation guidance with South African industry interviews, for mine planners and regulators deciding what post mining land should become after closure.

What this report foundA framework for planning land use on rehabilitated coal mining land, built from a review of international and national regulatory and corporate guidance and...

R1500,00

R1500,00

Raina Hattingh

What this report found

A framework for planning land use on rehabilitated coal mining land, built from a review of international and national regulatory and corporate guidance and from interviews with industry practitioners. The review found that existing guidance requires land to be returned as close as possible to its pre mining condition, while community needs are pushing rehabilitation towards alternative land uses that can sustain livelihoods.

The Optimum Methodology for Conducting High Resolution, Shallow Reflection Seismic Surveys on South African Collieries

Marianne J. Maccelari

2001

Field procedure standards for high resolution seismic work over seams 30 to 100 m deep, trialled at two Mpumalanga collieries, with a cost comparison against exploration drilling.

What this report foundShallow reflection seismic surveys failed on South African collieries mainly because too little preliminary data, from vertical seismic profiles and noise...

R1500,00

R1500,00

Marianne J. Maccelari

What this report found

Shallow reflection seismic surveys failed on South African collieries mainly because too little preliminary data, from vertical seismic profiles and noise spreads, was gathered before the surveys were designed. Following the field procedures set out here produces usable data for mine planning. For target depths under about 150 m, exploration drilling stays cheaper, because shot holes must be drilled below the weathered layer.

Shopping Basket