Supression and Control of Coal Dust in Underground Continuous Miner Sections
AP Cook, April 2020
R1500,00
Description
Related Products
Mapping of Old Bords and Pillars Revisited
2019
Desktop review of recent unmanned aerial and underwater vehicle systems and how they compare with borehole scanning, for engineers assessing the stability of old underground workings.
What this report foundMapping abandoned, inaccessible bord and pillar workings comes down to two options: borehole deployed laser or sonar scanning, or sensors carried in by...
R1500,00
Mapping abandoned, inaccessible bord and pillar workings comes down to two options: borehole deployed laser or sonar scanning, or sensors carried in by unmanned vehicles. Drone mounted laser scanning for air filled voids and sonar carried by small submersibles for flooded workings were judged the most promising, but intrinsic safety, deployment and the risk of losing equipment still favour borehole methods for occasional use.
The Amenability of Some South African Bituminous Coals to Binderless Briquetting
2001
Laboratory compaction work with testing of compressive, abrasion and water resistance, giving steam and metallurgical coal producers a basis for judging which fines can be agglomerated.
What this report foundNine bituminous coals from the Witbank, Waterberg and Soutpansberg coalfields all formed compacts without a binder, and the process worked better with coking...
R1500,00
Nine bituminous coals from the Witbank, Waterberg and Soutpansberg coalfields all formed compacts without a binder, and the process worked better with coking coals. Reactive maceral content, free swelling index and Hardgrove grindability index governed briquette strength, with ash and kaolinite contents also contributing to bonding. Briquetting pressure, feed moisture and particle size distribution controlled the outcome.
Recharge in Rehabilitated Opencast Collieries
2019
Groundwater levels and pumping records from five rehabilitated opencast pits at South African collieries, for hydrogeologists and closure planners estimating post-mining water balances.
What this report foundRecharge factors of 23.5 per cent and 12.9 per cent were calculated at the two rehabilitated pits with complete data.
R1500,00
Recharge factors of 23.5 per cent and 12.9 per cent were calculated at the two rehabilitated pits with complete data. The higher value reflected surface drainage towards the pit centre and eroded topsoil; the lower one, a deep pit floor with well compacted spoil and intact cover. The rates are site specific and no generic formula could be derived.