Final report of a three year study on rehabilitated South African coal mine soils, testing an invertebrate based addition to conventional rehabilitation, for environmental managers and land use planners.
by University of Pretoria | May 2018
Ants, termites, dung beetles and earthworms are known to improve soil health, but none had been deliberately applied as part of a mine reclamation strategy. Experimental and field scale studies asked whether dung beetles maintain their burial activity, and the soil services that follow, in soils typical of rehabilitated mine land, and set out recommendations for using them alongside existing methods.
R1500,00
Description
Related Products
Upgrading of coal fines with a Centrifugal Concentrator
Bench and pilot testing of four centrifugal concentrator models on fine coal from two collieries, with operating variables that resisted correlation flagged for further work. For plant metallurgists.
What this report foundFour centrifugal concentrators all cut ash in fine coal, with desliming the decisive step.
R1500,00
Four centrifugal concentrators all cut ash in fine coal, with desliming the decisive step. The best unit took ash from 35.2% to 18.47% and sulphur from 0.68% to 0.36% in a single stage, raising calorific value from 23.78 to 26.16 MJ/kg. Pilot work reached 19% ash on thickener underflow and reconstituted spiral feed.
Application of EARTH Ion Exchange Technology to Process RO (Hipro) Brine from eWRP
2010
Pilot trial on brine from a working water reclamation plant on the Mpumalanga coalfield, the first of four studies testing ion exchange on coal mine liquors.
What this report foundIon exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives...
R1500,00
Ion exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives feedstock, and recovered close to half of the water the reverse osmosis stage leaves behind. On this basis the existing brine pond and the two planned for the plant expansion would not be needed.