Rehabilitation risk assessment model
VD Weyer / February 2020
R1500,00
Description
Related Products
TRI-FLOâ„¢ Tests Conducted at South Witbank Coal Mine
2003
Trial of an imported dense medium separator installed in a fine coal pilot plant at a Witbank mine, for plant designers weighing alternatives to cyclones.
What this report foundThe separator handled fine coal and produced a 28 MJ/kg product, but its measured separation efficiency was lower than that of conventional dense medium...
R1500,00
200317 pages
The separator handled fine coal and produced a 28 MJ/kg product, but its measured separation efficiency was lower than that of conventional dense medium cyclones and it was harder to operate. Two efficiency tests produced no evidence that the unit outperforms cyclones on fine coal, so cyclones were recommended when the plant was rebuilt at its next site.
Predicting the Environmental Impact and Sustainability of Irrigation With Coal Mine Water
2006
Commercial scale field trials and modelling of centre pivot irrigation with gypsiferous and sodium sulphate mine water, covering crop, soil and aquifer effects for mines and regulators.
What this report foundIrrigation with calcium and sulphate rich mine water proved feasible and sustainable over eight years at a Mpumalanga colliery, with no significant impact on...
R1500,00
Irrigation with calcium and sulphate rich mine water proved feasible and sustainable over eight years at a Mpumalanga colliery, with no significant impact on soil, surface water or groundwater. Sugarbeans, wheat, maize, potatoes and pastures were grown on a commercial scale. High calcium and magnesium suppressed potassium uptake, and waterlogging from poor site selection was the main problem.