Unlocking obstacles to the commercialisation of eutectic freeze crystallisation

Laboratory crystallisation cell tests on copper, brass, stainless steel and aluminium cooling plates in sodium sulphate solution, aimed at replacing mechanical scraping in brine treatment plants.

Coaltech | October 2022

What this report found

Heat exchanger material governs how fast ice scale forms during eutectic freeze crystallisation of dilute brine. Induction time fell as thermal conductivity rose, so copper scaled first, while aluminium gave the lowest scaling rate because its low surface energy pushed ice crystallisation into the bulk. Stainless steel delayed onset but scaled heavily once nucleation started.

R1500,00

Description

Eutectic Freeze Crystallization (EFC) is a method that has potential for treating brines using less energy than evaporative crystallization while achieving high yields of water and salts. The technology is currently being developed for potential industrial treatment of brines. EFC is an innovative technology proposed for the treatment of brines to produce pure salt and water products. Scaling of the heat exchanger surface by both ice and salt is currently one of the major setbacks in the industrial implementation of EFC. Scaling is currently being controlled using mechanical scraping, which is susceptible to mechanical breakdown, thus negatively impacting the overall process efficiency

Related Products

More Effective Use of Disposable Dust masks

Underground field trials, laboratory seal tests and operator questionnaires at two collieries, covering mask selection, fit, issue records and service time. For ventilation and occupational hygiene staff.

What this report foundDust masks worn by load haul dump operators passed 200 mg of filter loading in an average of 1.7 hours, and continuous miner, shuttle car and roofbolt...

R1500,00

R1500,00

What this report found

Dust masks worn by load haul dump operators passed 200 mg of filter loading in an average of 1.7 hours, and continuous miner, shuttle car and roofbolt operators reached the same point within two to five hours. Every mask failed laboratory fit testing. An eight hour service life is too long.

GJ de Korte

W.T. Motsoari

Soil Covers Guideline

2022

R1500,00

R1500,00

Shopping Basket