DyVar Pilot Test Report
Batch pilot trial of a salt concentration unit on saline coal mine effluent at the eMalahleni reclamation plant, for mines weighing brine treatment and salt recovery.
A pilot brine concentrator treated Stage 3 reject effluent from a mine water reclamation plant, raising total dissolved solids from 24 g/L to 154 g/L at 88 per cent water recovery. The condensate met the national potable water specification. A separate run concentrated brine from 76 g/L to 145 g/L, solid salts were precipitated, and no scaling or fouling was seen.
R1500,00
Description
Related Products
The Optimum Methodology for Conducting High Resolution, Shallow Reflection Seismic Surveys on South African Collieries
2001
Field procedure standards for high resolution seismic work over seams 30 to 100 m deep, trialled at two Mpumalanga collieries, with a cost comparison against exploration drilling.
What this report foundShallow reflection seismic surveys failed on South African collieries mainly because too little preliminary data, from vertical seismic profiles and noise...
R1500,00
Shallow reflection seismic surveys failed on South African collieries mainly because too little preliminary data, from vertical seismic profiles and noise spreads, was gathered before the surveys were designed. Following the field procedures set out here produces usable data for mine planning. For target depths under about 150 m, exploration drilling stays cheaper, because shot holes must be drilled below the weathered layer.
FGX Dry Processing Tests Conducted at Exxaro R&D
2009
Pilot tests of a waterless de-stoning unit on raw coals from four South African collieries at a Pretoria research site, for plant metallurgists weighing dry beneficiation.
What this report foundA compound dry cleaning machine de-stoned low grade raw coal without using water, but separation efficiency was low, with high relative density cut points and...
R1500,00
200931 pages
A compound dry cleaning machine de-stoned low grade raw coal without using water, but separation efficiency was low, with high relative density cut points and EPM values in the order of 0.3. Misplaced material was heavy and coal below 6 mm reported to product almost indiscriminately. The unit is cheap to buy and run, needs only crushing to 50 mm, and gives high throughput.
Development of Design Procedures for Long Slender Pillars
2005
Design guidance for rib pillars, built from back analysed in situ coal tests and two dimensional modelling rather than empirical data, for rock engineers laying out high extraction panels.
What this report foundNumerical modelling produced upper and lower bound strength formulae for rib pillars, the lower bound covering weak roof and floor contacts.
R1500,00
Numerical modelling produced upper and lower bound strength formulae for rib pillars, the lower bound covering weak roof and floor contacts. The formulae apply between width to height ratios of 0.5 and 2.5, with linear interpolation below that, and give conservative designs above 3. Adjustments were suggested where regular joint sets occur.