Coaltech Research Association

More Effective Use of Disposable Dust masks

Underground field trials, laboratory seal tests and operator questionnaires at two collieries, covering mask selection, fit, issue records and service time. For ventilation and occupational hygiene staff.

M Mokwena, March 2020

What this report found

Dust masks worn by load haul dump operators passed 200 mg of filter loading in an average of 1.7 hours, and continuous miner, shuttle car and roofbolt operators reached the same point within two to five hours. Every mask failed laboratory fit testing. An eight hour service life is too long.

R1500,00

Description

Related Products

Fine Coal Dense-medium Cyclone Tests Conducted at Leeuwpan Coal Mine

GJ de Korte

2007

Pilot dense medium cyclone testing on fine coal inside a working spiral plant at a Mpumalanga opencast mine, ending in a full scale plant design.

What this report foundDense medium cyclones on the fine coal fraction lifted product yield well above the spiral circuit they were compared against and gave closer control of...

R1500,00

R1500,00

GJ de Korte

200720 pages

What this report found

Dense medium cyclones on the fine coal fraction lifted product yield well above the spiral circuit they were compared against and gave closer control of product quality. Cut point density control proved the hardest part of running the plant, medium properties being critical. Magnetic separator capacity had to match the duty, and a basement was needed to contain and recover medium spillage.

Application of Earth ion Exchange Technology to Convert Acid Mine Drainage from Kilbarchan Colliery into Saleable Products

EARTH

2010

Pilot scale ion exchange trial on acid drainage pumped from a closed colliery in KwaZulu-Natal, for mine water managers weighing alternatives to reverse osmosis.

What this report foundIon exchange treatment of acid mine drainage from a closed KwaZulu-Natal colliery was piloted and shown to give effluent free processing, converting the salts...

R1500,00

R1500,00

EARTH

What this report found

Ion exchange treatment of acid mine drainage from a closed KwaZulu-Natal colliery was piloted and shown to give effluent free processing, converting the salts into saleable products rather than sludge and brine. Reverse osmosis had previously produced water of discharge standard but left both. Combined flow from the two mine compartments averaged 4.6 megalitres a day.

Shopping Basket