Determine Possible Means to Conduct Large Scale Frictional Ignitions Tests, and the Value of These to Coaltech
A scoping exercise based on technical enquiries to mine safety organisations and discussions at an international conference, aimed at rock engineers and safety practitioners weighing test facility investment.
No operating full scale frictional ignition test facility was found anywhere in the world, and building one was judged expensive, impractical and unlikely to justify its cost against laboratory scale testing. Effort should instead go to small scale laboratory equipment using South African rocks, and to expanding geological data such as silica distribution and petrographic analysis.
R1500,00
Description
Related Products
Flammability, corrosion resistance and environment by V Mhlawakhe.pdf
Laboratory work turning high ash coal fines into moulded building composites, comparing coal tar pitch against a silicone binder, with strength, burning, corrosion and leaching tests. For product developers.
What this report foundAir blowing converted coal tar into a pitch with 11.27% volatile matter and 87.68% fixed carbon, which bound high ash coal fines into structural composites.
R1500,00
Air blowing converted coal tar into a pitch with 11.27% volatile matter and 87.68% fixed carbon, which bound high ash coal fines into structural composites. Compressive strengths ran from 106.58 to 344.71 MPa and flexural strengths from 48.75 to 159.30 MPa. Flammability was low across all composites and corrosion rates stayed below those of some commercial ceramic tiles.
Dense-medium Fine Coal Processing: Tests Conducted at South Witbank Coal Mine
2003
Pilot scale dense medium testing on fine coal at a Witbank colliery after the plant was moved from an earlier site, with sampling, efficiency and magnetite results for plant designers.
What this report foundThe fine coal dense medium pilot plant was rebuilt at South Witbank Coal Mine and run on fine coal, with tests covering single, double and three stage...
R1500,00
200319 pages
The fine coal dense medium pilot plant was rebuilt at South Witbank Coal Mine and run on fine coal, with tests covering single, double and three stage processing, the effect of recirculating load, magnetite size and losses, separation efficiency and continuous operation. The fast screen could not deliver the required capacity and was replaced by dewatering cyclones to deslime the feed.
Detection of Old Workings, Sinkholes, Underground Fires and Acid Mine Pollution Using Geophysics and Airborne Thermal Infrared Imagery
2002
Field trials at four collieries comparing ground and airborne geophysical methods, with case studies and an applications guideline for the Witbank and Highveld collieries.
What this report foundMicro-gravity, electrical resistivity and time domain electromagnetics located the boundary between old workings and virgin ground, but no ground technique...
R1500,00
Micro-gravity, electrical resistivity and time domain electromagnetics located the boundary between old workings and virgin ground, but no ground technique tested could resolve individual bords and pillars at the depths typical of the Witbank and Highveld coalfields. Airborne thermal infrared surveys worked well as a low cost regional reconnaissance tool for shallow sinkholes, fires and possible pollution plumes.
Geotechnical Factors Associated With Previously Mined Areas of Coal and Their Impact on Subsequent Extraction
2002
Masters research on pillar extraction in the Witbank Coalfield, ranking the ground conditions that decide method choice and safety, for rock engineers and mine planners.
What this report foundGeotechnical factors affecting secondary extraction were identified from interviews with collieries already re-mining pillars and with people experienced in...
R1500,00
Geotechnical factors affecting secondary extraction were identified from interviews with collieries already re-mining pillars and with people experienced in stooping, then quantified and ranked against the different aspects of the work. No single factor governs the outcome. Factors interact, so choosing a method and working safely in old workings depends on managing them together across disciplines.