Coaltech Research Association

Real-time Plant Efficiency Measurement

GJ de Korte

200230 pages

Assessment of the measurement and control equipment available to coal preparation plants, with recommendations for plant metallurgists on which instruments to add first.

What this report found

No single method gives a continuous, real time report on how a coal preparation plant is performing. Mass meters converted to yield values, on-line ash and moisture monitors, load cell chutes and automatic medium density control together supply most of what is needed. Measuring discard and slimes tonnages, particularly slimes disposal, remains the weakest point in plant accounting.

Preview

Contents

  • INTRODUCTION4
  • OTHER CONSIDERATIONS5
  • Multiple cyclones in a module5
  • Control of medium density6
  • Control of product quality7
  • Quality of different size fractions8
  • Moisture content9
  • WHAT WE WOULD LIKE TO HAVE10
  • WHAT IS AVAILABLE?10
  • Mass meters11

How it opens

When reference is made to the efficiency of a coal preparation plant or a specific coal processing unit, the sharpness of separation is usually inferred. The sharpness of separation reflects the ability of a unit, such as a dense-medium cyclone, to selectively separate coal and non-coal particles from each other based on the difference in their relative densities.

How it concludes

Open to members. Sign in to read the conclusion extract.

R1500,00

Description

Related Products

Evaluation of Ground Geophysical Techniques on the Waterberg Coal Fields

C Combrink

2008

Interim account of trial ground surveys along a profile in the Waterberg coalfield, for exploration geologists weighing survey cost against the structural detail mine planning needs.

What this report foundElectrical and electromagnetic ground surveys were run over a Waterberg profile with borehole logs and three dimensional seismic data as control, to test...

R1500,00

R1500,00

C Combrink

What this report found

Electrical and electromagnetic ground surveys were run over a Waterberg profile with borehole logs and three dimensional seismic data as control, to test whether cheaper methods can match seismic reflection for locating coal and faults. Resistivity tomography at two electrode spacings, frequency and time domain electromagnetics, controlled source audio magnetotellurics and magnetics were all acquired. Results are preliminary.

Rehabilitation of Mined Land Irrigation of Pastures with Gypsiferous Mine water

2011

Pasture and animal production work on rehabilitated mine land under mine water irrigation, joining agronomy and animal science, for rehabilitation and closure planners.

What this report foundGrazing trials on tall fescue pasture irrigated with gypsiferous mine water on rehabilitated mined land, run over several seasons.

R1500,00

R1500,00

What this report found

Grazing trials on tall fescue pasture irrigated with gypsiferous mine water on rehabilitated mined land, run over several seasons. The work covers steer stocking rates, dry matter intake by cattle, and the factors that control pasture quality and intake, among them nitrogen fertilisation, stage of growth, sward structure and grazing intensity. Findings are reported study by study.

Development of Junior Management and Supervisory Personnel for the Mining Section of the Future

2004

Interviews, questionnaires and on site observation at three South African collieries, with recommended training content and selection criteria for supervisors and junior managers in mining sections.

What this report foundMines already provide substantial training and their junior managers were found motivated and committed, yet development at this level remains problematic.

R1500,00

R1500,00

What this report found

Mines already provide substantial training and their junior managers were found motivated and committed, yet development at this level remains problematic. Gaps sat in commercial exposure, financial and accounting skills, industrial relations, quality standards, administration and project management. The report sets out the attributes to screen for at appointment and a framework that makes candidates responsible for their own development.

Treatment of Sulphate Rich Effluents with the Combined Electrolytic/Biological Process

2003

Laboratory work on producing hydrogen by electrolysis as the energy source for sulphate reducing bacteria, aimed at cutting the running cost of treating sulphate rich mine water.

What this report foundHydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought.

R1500,00

R1500,00

What this report found

Hydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought. Stainless steel electrodes in acid mine drainage gave hydrogen at about a third of the bought in price while oxidising ferrous iron to ferric, which helps downstream treatment. Iron and zinc electrodes dissolved too quickly to be viable.

Shopping Basket