Wetland rehabilitation with Dongalock shutters
Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.
Coaltech | January 2021
Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.
Coaltech will send you this report by email. Members sign in and download it directly.
Description
Related Products
Geotechnical Factors Associated With Previously Mined Areas of Coal and Their Impact on Subsequent Extraction
2002
Masters research on pillar extraction in the Witbank Coalfield, ranking the ground conditions that decide method choice and safety, for rock engineers and mine planners.
What this report foundGeotechnical factors affecting secondary extraction were identified from interviews with collieries already re-mining pillars and with people experienced in...
Determination of the Impact of Coal Mine Water Irrigation on Groundwater Resources
2007
Groundwater investigation behind mine water irrigation in the Mpumalanga coalfields, with hydraulic testing, leaching studies and site selection and monitoring guidance for mines and regulators.
What this report foundMonitoring and geochemical modelling at five pilot sites, on undisturbed soils and on opencast spoils, showed that most soils held a large share of the applied...
Demonstrate the efficiency of UAV-GPR for assessment of rehabilitation sites and detection of subsurface cavities
2023
Field trials at two South African collieries comparing drone mounted ground penetrating radar against ground based surveys, for measuring rehabilitation soil thickness and locating shallow voids. For rehabilitation teams.
What this report foundGround based radar mapped rehabilitation soil profiles well enough to replace much of the auger sampling normally needed, and a 100 MHz system picked out...
Real-time Plant Efficiency Measurement
2002
Assessment of the measurement and control equipment available to coal preparation plants, with recommendations for plant metallurgists on which instruments to add first.
What this report foundNo single method gives a continuous, real time report on how a coal preparation plant is performing.