Wetland rehabilitation with Dongalock shutters
Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.
Coaltech | January 2021
Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.
R1500,00
Description
Related Products
BCI Chemical Research & Analysis – Potassium & Sodium
2011
Chemical market survey commissioned to price the by products of brine treatment, covering South African and global price levels for five salts and the sector outlook at the time.
What this report foundMarket prices are set out for sodium sulphate, sodium chloride, sodium nitrate, potassium nitrate and potassium chloride, in South Africa and abroad, as at...
R1500,00
Market prices are set out for sodium sulphate, sodium chloride, sodium nitrate, potassium nitrate and potassium chloride, in South Africa and abroad, as at early 2011, with Chinese supplier quotes alongside United States averages. The work was done to test whether salts recovered from mine water brine could be sold at a worthwhile price.
FGX Dry Processing Tests Conducted at Exxaro R&D
2009
Pilot tests of a waterless de-stoning unit on raw coals from four South African collieries at a Pretoria research site, for plant metallurgists weighing dry beneficiation.
What this report foundA compound dry cleaning machine de-stoned low grade raw coal without using water, but separation efficiency was low, with high relative density cut points and...
R1500,00
200931 pages
A compound dry cleaning machine de-stoned low grade raw coal without using water, but separation efficiency was low, with high relative density cut points and EPM values in the order of 0.3. Misplaced material was heavy and coal below 6 mm reported to product almost indiscriminately. The unit is cheap to buy and run, needs only crushing to 50 mm, and gives high throughput.
Recharge in Rehabilitated Opencast Collieries
2019
Groundwater levels and pumping records from five rehabilitated opencast pits at South African collieries, for hydrogeologists and closure planners estimating post-mining water balances.
What this report foundRecharge factors of 23.5 per cent and 12.9 per cent were calculated at the two rehabilitated pits with complete data.
R1500,00
Recharge factors of 23.5 per cent and 12.9 per cent were calculated at the two rehabilitated pits with complete data. The higher value reflected surface drainage towards the pit centre and eroded topsoil; the lower one, a deep pit floor with well compacted spoil and intact cover. The rates are site specific and no generic formula could be derived.