Wetland rehabilitation with Dongalock shutters
Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.
Coaltech | January 2021
Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.
Coaltech will send you this report by email. Members sign in and download it directly.
Description
Related Products
Real-time Plant Efficiency Measurement
2002
Assessment of the measurement and control equipment available to coal preparation plants, with recommendations for plant metallurgists on which instruments to add first.
What this report foundNo single method gives a continuous, real time report on how a coal preparation plant is performing.
Assessing the Ecosystem Processes of Ecological Infrastructure on Post-coal Mined Land
2017
Physical, chemical and biological sampling at two points on each of four Mpumalanga watercourses, with wetland functionality assessment and mitigation recommendations, for mine environmental and water managers.
What this report foundWatercourses on post mined land near Kriel showed deterioration in manganese, calcium, magnesium, sodium, total dissolved salts and sulphate, while other...