Coaltech Research Association

Verification of the New Coal Pillar Strength Formula and Investigations Into the Prediction of Pillar Life in Witbank and Highveld Coalfields

I Canbulat

Covers pillar load and strength estimation, the limits of tributary area theory, and the extraction gains available from revised strength formulae, for rock engineers designing bord and pillar workings.

by I Canbulat | February 2004

What this report found

Laboratory testing showed coal specimen strength rising linearly with width to height ratio and falling exponentially with specimen size, the size effect becoming insignificant beyond about 2 m diameter. The slope of that relationship was the same for coals from different mines, while the intercept varied with specimen size.

R1500,00

Description

Related Products

Evaluate the Remaining Resources of Low Phosphorus Coal in Mpumalanga Province

D.S. Xaba

2004

Assessment of remaining metallurgical grade coal in the Witbank, Highveld and Ermelo coalfields from national borehole records, for resource planners and buyers of reductant coal.

What this report foundTonnage estimates for the remaining low phosphorus resource could not be produced, because the phosphorus analyses supplied by mining companies did not state...

R1500,00

R1500,00

D.S. Xaba

What this report found

Tonnage estimates for the remaining low phosphorus resource could not be produced, because the phosphorus analyses supplied by mining companies did not state what had been measured. Distribution trends were still mapped. Coal at or below 0.010 per cent phosphorus is widespread in the Witbank Coalfield, restricted to the far northwestern Highveld, and follows a northwest to southeast band in eastern Ermelo.

Simulation of Regional Collapses in Bord & Pillar Workings

BECK Engineering

2018

Three dimensional modelling of a documented subsidence event in the Witbank coalfield, aimed at reserves in the seam above old workings that current pillar strength formulae sterilise.

What this report foundFinite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar...

R1500,00

R1500,00

BECK Engineering

What this report found

Finite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar deterioration triggers snap through of a strong sandstone plate in the overburden. Too little was known about the chosen collapse to back out a real pillar safety factor, so the calibration goal was not met.