The impact of cattle grazing on rehabilitated land

Two annual surveys of species composition, biomass and soil sampling inside and outside fenced plots on rehabilitated pasture at an opencast colliery near Ogies, with benchmark sites for comparison.

ND Thovhakale, EM Stam / July 2019

What this report found

Grazing pressure on the rehabilitated block ran at roughly three times the estimated carrying capacity. The sward was dominated by low quality grasses with a high proportion of bare ground and a raised erosion risk. Fenced exclosures over one year changed the abundance of a few species, but the vegetation showed no clear direction of recovery.

R1500,00

Description

Related Products

Application of Earth ion Exchange Technology to Convert Acid Mine Drainage from Kilbarchan Colliery into Saleable Products

EARTH

2010

Pilot scale ion exchange trial on acid drainage pumped from a closed colliery in KwaZulu-Natal, for mine water managers weighing alternatives to reverse osmosis.

What this report foundIon exchange treatment of acid mine drainage from a closed KwaZulu-Natal colliery was piloted and shown to give effluent free processing, converting the salts...

R1500,00

R1500,00

EARTH

What this report found

Ion exchange treatment of acid mine drainage from a closed KwaZulu-Natal colliery was piloted and shown to give effluent free processing, converting the salts into saleable products rather than sludge and brine. Reverse osmosis had previously produced water of discharge standard but left both. Combined flow from the two mine compartments averaged 4.6 megalitres a day.

A manual for authorisation of pitlakes as a closure option for South African coal mines

2021

A practical guide for coal mines and their consultants, built on earlier water research on pitlake viability, with South African examples from the Highveld, Waterberg and KwaZulu-Natal coal fields.

What this report foundSets out the authorisation route for leaving a pitlake as a closure landform, covering water use licensing, environmental authorisation and the wider...

R1500,00

R1500,00

What this report found

Sets out the authorisation route for leaving a pitlake as a closure landform, covering water use licensing, environmental authorisation and the wider legislative process. There is no single application that grants approval, and the route is long and partly duplicated, so several applications are required.

SJ Mangena

Treatment of Sulphate Rich Effluents with the Combined Electrolytic/Biological Process

2003

Laboratory work on producing hydrogen by electrolysis as the energy source for sulphate reducing bacteria, aimed at cutting the running cost of treating sulphate rich mine water.

What this report foundHydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought.

R1500,00

R1500,00

What this report found

Hydrogen for biological sulphate removal can be generated on site by electrolysis more cheaply than it can be bought. Stainless steel electrodes in acid mine drainage gave hydrogen at about a third of the bought in price while oxidising ferrous iron to ferric, which helps downstream treatment. Iron and zinc electrodes dissolved too quickly to be viable.