Dry Processing of Coal – Progress Report: Tests Conducted on the IMS / Slater Coal Marketing Allair Dry Jig
201613 pages
Test work on a dry jig installed at a Balmoral site, covering coal sized below 50 mm and duff below 12 mm, for producers considering waterless beneficiation.
A 30 tonne per hour pilot Allair dry jig upgraded run of mine coal to thermal coal specification, but could not effectively beneficiate finer duff. Cut point densities and EPM values matched other dry processing equipment, though the jig appeared to give better control of the parameters governing separation. Four tests ran on run of mine coal and two on duff.
Contents
- Introduction4
- Allair jig4
- Tests carried out6
- Results obtained7
- Discussion of results11
How it opens
IMS in cooperation with Slater Coal Marketing installed a 30 tonne per hour Allair dry jig at Slater Coal’s site near Balmoral for the purpose of evaluating the technology and to assess the potential of these jigs to upgrade raw coal to thermal coal specification.
How it concludes
R1500,00
Description
Related Products
Developing a Mechanised Cleaning System – for Cleaning Under and Around Moving Conveyors
2013
Follow on review of mechanised conveyor cleaning equipment close to being usable underground, flameproof and not, written to help the coal industry agree which options to develop.
What this report foundNo flameproof mechanised system for cleaning under and around moving conveyors was found to exist anywhere.
R1500,00
No flameproof mechanised system for cleaning under and around moving conveyors was found to exist anywhere. Of more than 200 mini machinery manufacturers identified worldwide, few build for mining, and only one or two products were near ready for surface use. Manufacturer interest in mining applications has since risen, but the industry has not settled on which technology to back.
Stockpiling of Coal Mine Soils
2016
Physical, chemical and microbiological analysis of 257 unmined, stockpile and rehabilitated soil samples from four Witbank opencast mines, plus a pot trial on amendments, for soil handling planning.
What this report foundStockpiling degraded every soil property measured across four Witbank area mines. Clay content of topsoil and subsoil rose by 50 to 60 per cent, surface bulk...
R1500,00
Stockpiling degraded every soil property measured across four Witbank area mines. Clay content of topsoil and subsoil rose by 50 to 60 per cent, surface bulk density increased from stockpiling through to rehabilitation, and effective depth on rehabilitated areas was under 17 cm in most cases. Topsoil organic carbon fell by almost half and microbial species numbers dropped in the stockpiles.