Application of Earth ion Exchange Technology to Convert Acid Mine Drainage from Kilbarchan Colliery into Saleable Products
Pilot scale ion exchange trial on acid drainage pumped from a closed colliery in KwaZulu-Natal, for mine water managers weighing alternatives to reverse osmosis.
Ion exchange treatment of acid mine drainage from a closed KwaZulu-Natal colliery was piloted and shown to give effluent free processing, converting the salts into saleable products rather than sludge and brine. Reverse osmosis had previously produced water of discharge standard but left both. Combined flow from the two mine compartments averaged 4.6 megalitres a day.
R1500,00
Description
Related Products
Rehabilitation of Mined Land Irrigation of Pastures with Gypsiferous Mine water
2011
Pasture and animal production work on rehabilitated mine land under mine water irrigation, joining agronomy and animal science, for rehabilitation and closure planners.
What this report foundGrazing trials on tall fescue pasture irrigated with gypsiferous mine water on rehabilitated mined land, run over several seasons.
R1500,00
Grazing trials on tall fescue pasture irrigated with gypsiferous mine water on rehabilitated mined land, run over several seasons. The work covers steer stocking rates, dry matter intake by cattle, and the factors that control pasture quality and intake, among them nitrogen fertilisation, stage of growth, sward structure and grazing intensity. Findings are reported study by study.
More Effective Use of Disposable Dust masks
Underground field trials, laboratory seal tests and operator questionnaires at two collieries, covering mask selection, fit, issue records and service time. For ventilation and occupational hygiene staff.
What this report foundDust masks worn by load haul dump operators passed 200 mg of filter loading in an average of 1.7 hours, and continuous miner, shuttle car and roofbolt...
R1500,00
Dust masks worn by load haul dump operators passed 200 mg of filter loading in an average of 1.7 hours, and continuous miner, shuttle car and roofbolt operators reached the same point within two to five hours. Every mask failed laboratory fit testing. An eight hour service life is too long.