Can old bord-and-pillar workings be mapped from surface?
Desktop review updating two earlier assessments, weighing borehole scanning, robots and unmanned aerial platforms as routes to locating old workings ahead of opencast drilling and blasting.
No surface geophysical method can map individual bords and pillars at the depths typical of the Witbank coalfield, a limit the review attributed to physics rather than to technology, since the targets are small relative to their depth and conductive layers often lie above the seam. Borehole laser scanning remains the workable option, with sonar suited to flooded workings.
R1500,00
Description
Related Products
Cleaning Near Moving Conveyors
2011
First phase of a two part investigation into conveyor cleaning practice at South African coal mines, covering the legal position, current mine practice and available machinery.
What this report foundConveyance legislation promulgated in 2008 and enforced soon after left the coal industry without a lawful way to clean near and under running conveyors.
R1500,00
Conveyance legislation promulgated in 2008 and enforced soon after left the coal industry without a lawful way to clean near and under running conveyors. The first phase defined the problem, recorded the cleaning practices mines already use successfully, and built a structured database of mechanised platform options worth pursuing. High risk areas remain drives, take ups, snub and tail pulleys and transfer points.
Application of EARTH Ion Exchange Technology to Process RO (Hipro) Brine from eWRP
2010
Pilot trial on brine from a working water reclamation plant on the Mpumalanga coalfield, the first of four studies testing ion exchange on coal mine liquors.
What this report foundIon exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives...
R1500,00
Ion exchange applied to brine from a three stage reverse osmosis plant at eMalahleni converted the brine entirely into saleable fertiliser and explosives feedstock, and recovered close to half of the water the reverse osmosis stage leaves behind. On this basis the existing brine pond and the two planned for the plant expansion would not be needed.