Dense-medium Fine Coal Processing: Tests Conducted at South Witbank Coal Mine
200319 pages
Pilot scale dense medium testing on fine coal at a Witbank colliery after the plant was moved from an earlier site, with sampling, efficiency and magnetite results for plant designers.
The fine coal dense medium pilot plant was rebuilt at South Witbank Coal Mine and run on fine coal, with tests covering single, double and three stage processing, the effect of recirculating load, magnetite size and losses, separation efficiency and continuous operation. The fast screen could not deliver the required capacity and was replaced by dewatering cyclones to deslime the feed.
Contents
- Introduction4
- Early results at South Witbank5
- Number of processing stages and the influence of recirculating load5
- Problems experienced14
- Sampling14
- Analysis of samples14
- Magnetite14
- Efficiency tests15
- Float-and-sink analysis18
- Continuous operation18
How it opens
The Coaltech 2020 fine coal dense-medium pilot plant was taken out of commission at Koornfontein Colliery on Friday, 7 June 2002. This was done to enable the plant to be dismantled and moved to South Witbank Coal Mine (SWC) where it was to be tested on fine coal from the No. 4 Seam. The plant was re-commissioned at SWC on 18 September 2002.
R1500,00
Description
Related Products
Flammability, corrosion resistance and environment by V Mhlawakhe.pdf
Laboratory work turning high ash coal fines into moulded building composites, comparing coal tar pitch against a silicone binder, with strength, burning, corrosion and leaching tests. For product developers.
What this report foundAir blowing converted coal tar into a pitch with 11.27% volatile matter and 87.68% fixed carbon, which bound high ash coal fines into structural composites.
R1500,00
Air blowing converted coal tar into a pitch with 11.27% volatile matter and 87.68% fixed carbon, which bound high ash coal fines into structural composites. Compressive strengths ran from 106.58 to 344.71 MPa and flexural strengths from 48.75 to 159.30 MPa. Flammability was low across all composites and corrosion rates stayed below those of some commercial ceramic tiles.
Review of Current and Expected Underground Coal Mining Methods and an Evaluation of the Best Practices Associated with These
2010
Review of underground coal production systems in South Africa set against practice in Australia, China and the United States, with guidance on equipment choice and section planning.
What this report foundSouth African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while...
R1500,00
South African underground sections average about 60 000 t a month, against 130 000 to 160 000 t for single pass bolter miner units on continuous haulage, while the better sections target 1.4 to 1.6 Mt a year. Australian longwalls deliver 5 to 7 Mt a year from one face, compared with 3 to 5 Mt at the two local wall operations.