Coaltech Research Association

The Remaining Pillar Resources in the Northern Witbank-Highveld Coalfield

by Grant van Heerden & Vellies Veldsman | September 2003

R1500,00

Description

Related Products

Evaluation of Ground Geophysical Techniques on the Waterberg Coal Fields

C Combrink

2008

Interim account of trial ground surveys along a profile in the Waterberg coalfield, for exploration geologists weighing survey cost against the structural detail mine planning needs.

What this report foundElectrical and electromagnetic ground surveys were run over a Waterberg profile with borehole logs and three dimensional seismic data as control, to test...

R1500,00

R1500,00

C Combrink

What this report found

Electrical and electromagnetic ground surveys were run over a Waterberg profile with borehole logs and three dimensional seismic data as control, to test whether cheaper methods can match seismic reflection for locating coal and faults. Resistivity tomography at two electrode spacings, frequency and time domain electromagnetics, controlled source audio magnetotellurics and magnetics were all acquired. Results are preliminary.

Dr Andre van Niekerk

Benefits of an Apiary at a Rehabilitation Site

Ian Mey

2019

Desktop study based on literature, a stakeholder workshop and specialist consultation, assessing whether keeping bees on rehabilitating mine land pays, for closure teams weighing aftercare options.

What this report foundThe financial benefit of bees to a rehabilitating site could not be modelled with confidence, and a field trial to show direct benefit is hard to configure...

R1500,00

R1500,00

Ian Mey

What this report found

The financial benefit of bees to a rehabilitating site could not be modelled with confidence, and a field trial to show direct benefit is hard to configure because so many variables affect rehabilitation. Apiaries suit sites where bee friendly plants are established, the return coming through honey yield rather than measured gains in biodiversity or ground cover, at low establishment cost.

Wetland rehabilitation with Dongalock shutters

2021

Two field trials, one on a mine affected wetland and one on an undisturbed site, both built by community members, plus a desktop comparison against engineering and cost criteria.

What this report foundCompared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install...

R1500,00

R1500,00

What this report found

Compared against concrete and gabions on cost, construction time, footprint, durability and safety, the Dongalock product proved cheaper and quicker to install in small and medium incised valley bottom wetlands, and needs no heavy plant, so local enterprises can build it. Concrete still suits large wetlands carrying high water velocities.

Shopping Basket