Recharge in Rehabilitated Opencast Collieries
Groundwater levels and pumping records from five rehabilitated opencast pits at South African collieries, for hydrogeologists and closure planners estimating post-mining water balances.
Recharge factors of 23.5 per cent and 12.9 per cent were calculated at the two rehabilitated pits with complete data. The higher value reflected surface drainage towards the pit centre and eroded topsoil; the lower one, a deep pit floor with well compacted spoil and intact cover. The rates are site specific and no generic formula could be derived.
R1500,00
Description
Related Products
An Environmental Management Accounting Model for the South African Mining Industry
2008
Doctoral work comparing environmental cost practice at four South African mines and building a model from it, for environmental managers and finance staff in mining companies.
What this report foundConventional cost accounting at the mines studied could not report on physical structure or materials flow, so environmental costs such as water, energy and...
R1500,00
Conventional cost accounting at the mines studied could not report on physical structure or materials flow, so environmental costs such as water, energy and consumables stayed hidden and chances to cut them were lost. Four case studies across different commodities and mining methods showed the same limitations. An environmental management accounting model is proposed to identify and allocate those costs.
Evaluate the Remaining Resources of Low Phosphorus Coal in Mpumalanga Province
2004
Assessment of remaining metallurgical grade coal in the Witbank, Highveld and Ermelo coalfields from national borehole records, for resource planners and buyers of reductant coal.
What this report foundTonnage estimates for the remaining low phosphorus resource could not be produced, because the phosphorus analyses supplied by mining companies did not state...
R1500,00
Tonnage estimates for the remaining low phosphorus resource could not be produced, because the phosphorus analyses supplied by mining companies did not state what had been measured. Distribution trends were still mapped. Coal at or below 0.010 per cent phosphorus is widespread in the Witbank Coalfield, restricted to the far northwestern Highveld, and follows a northwest to southeast band in eastern Ermelo.