Coaltech Research Association

Geotechnical Factors Affecting High- and Low-wall Stability in Opencast Coal Mines

Grant van Heerden

by Grant van Heerden | May 2004

R1500,00

Description

Related Products

Development of Seam-Specific Strength Formulae for South African Collieries

2006

Statistical back analysis of an expanded collapse database, testing power, linear and non-linear strength models, for rock engineers setting pillar safety factors.

What this report foundBack analysis of 77 collapsed and 245 uncollapsed pillar cases showed that much of the scatter in pillar strength comes from differences between coalfields, so...

R1500,00

R1500,00

What this report found

Back analysis of 77 collapsed and 245 uncollapsed pillar cases showed that much of the scatter in pillar strength comes from differences between coalfields, so a single national formula is unrealistic. Seam specific formulae were derived for the major coalfields; Free State and KwaZulu Natal data remained too sparse. The lognormal safety factor distribution was retained.

Dry Processing of Coal – Progress Report: Tests Conducted on the IMS / Slater Coal Marketing Allair Dry Jig

GJ de Korte

2016

Test work on a dry jig installed at a Balmoral site, covering coal sized below 50 mm and duff below 12 mm, for producers considering waterless beneficiation.

What this report foundA 30 tonne per hour pilot Allair dry jig upgraded run of mine coal to thermal coal specification, but could not effectively beneficiate finer duff.

R1500,00

R1500,00

GJ de Korte

201613 pages

What this report found

A 30 tonne per hour pilot Allair dry jig upgraded run of mine coal to thermal coal specification, but could not effectively beneficiate finer duff. Cut point densities and EPM values matched other dry processing equipment, though the jig appeared to give better control of the parameters governing separation. Four tests ran on run of mine coal and two on duff.

Application of Earth ion Exchange Technology for Conversion of Ro Brine From Tutuka/new Denmark Into Saleable Products

EARTH

2010

Pilot trial on single stage reverse osmosis brine at a Mpumalanga power station treating acid drainage from a neighbouring colliery, with projections for the planned second stage.

What this report foundIon exchange converted reverse osmosis brine from a power station treating colliery water and cooling tower blowdown into fertiliser and explosives salts, with...

R1500,00

R1500,00

EARTH

What this report found

Ion exchange converted reverse osmosis brine from a power station treating colliery water and cooling tower blowdown into fertiliser and explosives salts, with no liquid effluent left to dispose of. Part of the water rejected by the reverse osmosis stage was also recovered as potable water. Brine is currently used for dust suppression and stored underground.

Shopping Basket