How to close a mine and walk away honestly

Closure is the industry’s largest promise and its longest liability. We built the framework for keeping that promise: pitlakes as an accepted end state, agreed criteria for handing land back, and the risk models that make a closure plan defensible.

2018 to 2024Core programme
E2020-1, E2020-2, 8.3.1Key projects
A. Johnstone, R. HattinghLead researchers
200+ delegatesat our Mine Closure Seminar
2 guidelines
the pitlakes manual and the relinquishment criteria
1 model
risk-based closure and rehabilitation planning
200+
people in the room when the sector convened on closure
27 years
of research behind the framework
01
The problem

Every mine ends. Few end well.

Every mining right carries the same final obligation: rehabilitate, close, hand the land back. But South Africa had no agreed test for when a mine has actually earned relinquishment, and pitlakes, an accepted closure landform in the rest of the mining world, had no authorisation path here. Without an agreed endpoint, closure liabilities sit on balance sheets forever and the land sits in limbo with them.

“Pitlakes have become an accepted form of mine closure around the world.”
A. Johnstone, Coal Mine Pitlakes as a Sustainable Mine Closure Option, Annual Report 2020/21
02
The research

Define done, then build the road to it

Three streams came together. Andrew Johnstone’s manual for authorising pitlakes gave mines and regulators a shared basis for leaving a pit void as a permanent, safe water body. The relinquishment criteria guideline set out what a mine must demonstrate before rehabilitated land can be handed back. And the risk assessment model under Project 8.3.1 gave closure planners a structured way to weigh receptors, risks and future land uses. Underneath sit two decades of supporting work, from soil covers to the socio-economic closure studies of the 2000s.

A. Johnstone
Pitlakes as a sustainable closure option.
R. Hattingh
Land use planning and closure risk modelling.
Coaltech Environment Committee
Direction and regulator engagement.
An opencast void. The landform every closure plan has to answer for. From our 2020/21 Annual Report.
200+
delegates at the Mine Closure Seminar. The conversation the industry used to avoid, hosted by the industry itself.
03
The impact

A shared definition of done

The criteria and the manual give mines and the regulator common language for the end state, which is what has to exist before any closure certificate is issued in good conscience. More than 200 people came to our Mine Closure Seminar to work through the framework. Closure used to be the conversation the industry avoided. It is now one we host.

Recognition

A UN University workshop, held on rehabilitated coal ground

In April 2025 the United Nations University, the G20 Global Land Initiative and LaRSSA brought a post-mining landscape restoration workshop to Kromdraai, the rehabilitated ground of our member Thungela. The land the delegates walked is managed to the LaRSSA rehabilitation standard we helped commission, and the recognition that followed belongs to the whole system: member investment, a shared national standard, and twenty years of research behind both.

“Exceptional professionalism in coal mining and land management”
Dr Alexey Alekseenko, United Nations University, on Thungela at the Kromdraai workshop, April 2025
2006 to 2018
Foundations
Socio-economic closure studies, land use frameworks, the first risk models.
2021
The pitlakes manual
A Manual for the Authorisation of Pitlakes as a Closure Option, under E2020-1.
2022 to 2024
The criteria
The guideline for agreed relinquishment criteria is developed and delivered.
2025
The sector convenes
Our Mine Closure Seminar brings 200+ members, researchers and partners into the room.

The evidence. Every claim traces to a published report.

PDFA Manual for the Authorisation of Pitlakes as a Closure OptionWhat this report showsE2020-1: leaving a pit void as a permanent, safe water body.2021Open in the Library →
PDFGuideline for agreed relinquishment criteria for mine closureWhat this report showsE2020-2: the test a mine must pass to hand land back.2022Open in the Library →
PDFThe development of an integrated rehabilitation risk assessment modelWhat this report showsProject 8.3.1: risk-based closure planning.2020Open in the Library →
PDFSocio-Economic Aspects of Mine Closure, Reports 1 and 2What this report showsThe early work on what closure does to people and towns.2010Open in the Library →

In the news

When a member’s rehabilitated ground hosts a United Nations University workshop, the closure argument is being made on the land itself.

MODERN MININGThungela land rehabilitation recognised as pioneering at G20 UN University workshop4 Apr 2025THUNGELALand rehabilitation efforts recognised as pioneering at G20 UN University workshopApr 2025
Shopping Basket