Project 8.3.3 – Framework to Guide Mine-related Land Use Planning Towards Optimisation of the Coal Mining Rehabilitated Landscape
Masters research combining a review of rehabilitation guidance with South African industry interviews, for mine planners and regulators deciding what post mining land should become after closure.
A framework for planning land use on rehabilitated coal mining land, built from a review of international and national regulatory and corporate guidance and from interviews with industry practitioners. The review found that existing guidance requires land to be returned as close as possible to its pre mining condition, while community needs are pushing rehabilitation towards alternative land uses that can sustain livelihoods.
R1500,00
Description
Related Products
Hydrothermal Treatment of Coal Discards and Sewage Sludge for the Production of Advanced Materials
2023
Laboratory carbonisation tests on discard and slurry samples blended with sewage sludge, with the resulting chars tested as adsorbents for dissolved pharmaceuticals. For waste and water treatment planners.
What this report foundCo-treating coal discards with sewage sludge by hydrothermal carbonisation gave hydrochars with better physicochemical properties than treating either waste...
R1500,00
Co-treating coal discards with sewage sludge by hydrothermal carbonisation gave hydrochars with better physicochemical properties than treating either waste alone. The blended hydrochar reached a surface area of 20.35 m2/g and a pore volume of 0.38 cm3/g, and removed 97.19% of nevirapine and 93.32% of lamivudine from recycled water. Routes to activated carbon and hydrogen storage were also assessed.
Simulation of Regional Collapses in Bord & Pillar Workings
2018
Three dimensional modelling of a documented subsidence event in the Witbank coalfield, aimed at reserves in the seam above old workings that current pillar strength formulae sterilise.
What this report foundFinite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar...
R1500,00
Finite element simulation reproduced the rapid collapse of bord and pillar workings in the 2 Seam at a Witbank colliery, showing that progressive pillar deterioration triggers snap through of a strong sandstone plate in the overburden. Too little was known about the chosen collapse to back out a real pillar safety factor, so the calibration goal was not met.